Cost effectiveness vs structural integrity
      07/04/08 10:08 AM

I am lost as what my best options are and can't seem to figure out which direction to go.

I want a shop/pole barn 30x40'x 14' H main door.

Like one poster has mentioned in his post, to have a level floor, the rear of the building will have to be built up a good 1.5' to 3'.

Now the 2 options I'm looking at is puring a footer and laying block and with the use of rebar in each cell, filling the blocks solid (probably 3 course up). then back filling with gravel and dirt, rock, whatever and then a nice 6" slab. Building the shop on top of the slab much like you would a house except using anchors plates for the 4x6 posts.

Or option 2 is sink the posts in the ground and using form boarding, filling in between the posts with concrete, of course I would have some type of anchors or rebar into the posts so the concrete would have something to attatch to and then back filling and then puring the floor.

I'm at a loss as to which would be the easiest and most cost effectivness and which would give me the best integrity as well.

Anyone with experience with the two options I have discribed ?


Post Extras: Print Post   Remind Me!   Notify Moderator  
jml755
Silver Member

Reged: 01/22/07
Posts: 181
Loc: Southeastern Michigan
Re: Cost effectiveness vs structural integrity new [re: Handyman]
      07/10/08 07:37 AM

Myself, I'd go with the form boarding instead of the block footing. I don't think I'd attach the concrete to the posts, though, due to frost heave. I don't know what TN frostline is, though, so it may be ok down there (I'm in Michigan).

Post Extras: Print Post   Remind Me!   Notify Moderator  
Handyman
Gold Member

Reged: 11/01/02
Posts: 255
Loc: Tenn. USA
Re: Cost effectiveness vs structural integrity new [re: jml755]
      07/10/08 10:49 AM

Thanks for the reply...

Tenn's frostline is only like 4" at best.
The reason I was thinking of attatching the concrete is so it doesn't fall while back filling. Something has to support the wall sections.

Post Extras: Print Post   Remind Me!   Notify Moderator  
jml755
Silver Member

Reged: 01/22/07
Posts: 181
Loc: Southeastern Michigan
Re: Cost effectiveness vs structural integrity new [re: Handyman]
      07/10/08 11:54 AM

If you're concerned about the wall just falling over from its own weight nail a couple of 1x2' to each post to form a keyway of sorts. That would support it IF NO EXTERNAL LATERAL FORCES ARE APPLIED. Would probably also support it from the backfill pushing against it, especially if you alternate inside/ouside backfill. If you're worried about knocking it over with a piece of equipment, a tack strip may or may not stop it and a good wack might even bust out a piece of the rebar or (worse yet) splinter a post while knocking the wall over if it's attached.

Post back with what you end up doing and how it works out.

Post Extras: Print Post   Remind Me!   Notify Moderator  
Pages: 1


Extra information
0 registered and 13 anonymous users are browsing this forum.

Moderators:  Muhammad, MikePA, Harv, JohnMiller3 

Permissions
      You cannot start new topics
      You cannot reply to topics
      HTML is disabled
      Markup is enabled
Jump to



TOP
CountryByNet.com is a ByNet Network Website
Reproduction of any part without written permission is strictly prohibited
Copyright 2008 CountryByNet.com :: User Agreement